The Mail Rail perhaps needs little by the way of introduction. In 1909 Sir Robert Bruce, Controller of the London Postal Region, was appointed to investigate whether the sub-surface transmission of mail in London was a matter worth pursuing. Having examined systems to be found elsewhere in the world, he produced a report recommending that the “Post Office (London) Railway” be constructed. Whilst various pneumatic options were considered, his ultimate recommendation was for an electric railway connecting the Eastern District Office with Paddington, passing through six other stations, five sorting offices and Liverpool Street station. The Post Office itself quickly approved of the scheme, and the Post Office (London) Railway Act was passed by Parliament in 1913 enabling its construction. That construction was originally intended to take only 15 months, and began shortly after the outbreak of WW1. Initially work proceeded relatively quickly despite the growing conflict. Tunnels were cut by means of a Greathead Shield, with iron ring segments forming the tunnel wall and work proceeded to plan until the tunnels had almost reached Mount Pleasant itself. Here, water began to seep through the tunnel walls and, despite the addition of extra lining, this would remain a problem throughout the life of the system.
Master and David Pearson down below |
Construction pauses on Post Office Railway tunnels
By 1917 the war in Europe – with its demands for both men and materiel – saw work on the Post Office Railway temporarily halted. The tunnels were largely complete, but the railway itself had yet to be fitted out. The tunnels were soon being used to store British Museum treasures safely away from German Zeppelin bombing raids on the Capital whilst serious consideration was given to suspending work completely.
In the end, work finally resumed in 1924 and was completed in 1927. The result was a narrow gauge railway over six miles long running from the Eastern District Office to Liverpool Street Station, then the East Central District Office (King Edward Building), Mount Pleasant Sorting Office, West Central District Office at Holborn, Western District Office at Wimpole Street, Western Parcels Office at Baker Street and then finally arriving at Paddington District Office where it connected with the main railway station.
This route changed slightly in 1965 when the Western Parcels Office, and its station, were closed and the Western District Office was moved to Rathbone Place. For the rest of the railway’s life, Rathbone Place would remain something of the “odd station out” as a result, looking very much like the office block basement it was in opposition to the more tube-like stations elsewhere on the line.
Trains were controlled by a switch system at each station and could be stopped at any station for loading or unloading of mail or could be run straight through. Mail was loaded via bags or trays into special containers which themselves were then loaded onto the trains. Mail was sent down to the platforms from the offices above via chutes and transferred up via conveyor belt or lifts. Indeed at Paddington a lengthy conveyor system was used to get bags of mail from the Post Office Railway directly onto the mainline platforms.
The End of the Line.For the next thirty five years, the Post Office Railway would be used to move mail around London. In 1987 it was refurbished and rebranded as the “Mail Rail” in celebration of its 60th anniversary. Finally, in the nineties, it was upgraded to then-state of the art computer control (indeed it would later be boasted that the system was run by a then-incredible “254 megabyte computer”).By the new millenium though it had become clear that the Post Office no longer wished to maintain the system. The network, they claimed, cost five times more to run than the equivalent cost of moving the mail by road. This was a figure that was soon subject to a certain amount of dispute. The Communication Workers Union claimed that, to a certain extent, Royal Mail were cooking the figures – that they had pursued a deliberate policy of running the railway down and only using it at one third of its true capacity. A report by the Greater London Authority also supported its continued use. Despite this, the Royal Mail announced in April 2003 that they would close it down at the end of May, and the railway moved its last parcel in the early hours of 31st May 2003.
The Mail Rail Experience
The BPMA’s plan is to take advantage of the fact that the Mail Rail, for the entirety of its operational life, was designed to be a fully self-supporting enclosed system. This means that, lying beneath Mount Pleasant itself, are not just a set of original platforms but also an extensive Workshop space and mail car depot. These can all be seen on the map below.If the plans are approved, the Workshop area will be used to house a visitor centre and cafe, whilst the larger depot space will be converted into both an events hall and exhibition space covering various aspects of the system’s history.
Looking through the supporting documentation, the intention is to try and avoid as much structural change to the system itself as possible, in recognition of its crucial heritage role. Lifted floors with grills and vents to expose the workings beneath will be used throughout the depot, and exhibits set apart from the original fixtures and fittings that still remain, allowing these to be exposed wherever possible.
It’s an admirable design goal, and one that should be impressive if achieved. The most interesting element of the plan, however, comes with the tunnels linking the car depot to the original platforms themselves. The intention appears to be to restore this section of line to full operation, running trains carrying visitors from the depot through to the platforms, where there will be more exhibits on the system’s industrial history – and indeed the history of moving mail by rail in general. The rolling stock used will be specially designed replicas of the original battery powered trains used to transport the mail. The network beyond Mount Pleasant will remain physically open, but running will be fixed to the confines of the new museum site. Although the planning documents make no mention of proposed timescales, it is clear that the BPMA are keen to press forward in line with their work on the wider museum. It is hard not to wish them success with their endeavour. David Pearson, who if all goes to plan will be Master in 2016, will definitely include a visit!